See How Our Trades Deliver.
Explore recent projects delivered by Stewart Richey Contracting Group’s specialized teams. Each case study highlights our commitment to safe work, dependable scheduling, and quality craftsmanship across the region.

Freight Service Center Facility in Bowling Green, KY
Construction project work for a 19,128 sq. ft. service center for a freight shipping facility. Services rendered included structural steel building with new office, 45 dock doors, and structural steel framing on tilt-up concrete wall panels as well as installation of electrical systems, lighting, gate system wiring, and plumbing for water, sewer, storm, and gas.

Multi-Unit Apartment Community Renovation in Bowling Green, KY
A large-scale plumbing renovation project across 326 residential units for The Emerson apartment community.

National Hotel Chain Fire Protection Installation in Bowling Green, KY
Fire protection facility services for a 185,500 sq. ft. hotel. Fire protection installations included 750 GPM fire pump and standpipes using metal and CPVC piping.

University Stadium Press Box Relocation & Renovation in Bowling Green, KY
A relocation of the press box in Western Kentucky University's Houchens Smith stadium and additional stadium renovations. Project work included installation of new electrical, lighting, fire alarm, and grid systems across multiple floors and elevator as well as hydronic piping, water source heat pumps, HVAC ductwork, and plumbing systems.

Global Glass Manufacturer Facility Construction in Bowling Green, KY
Construction of a 163,000 sq. ft. multi-level manufacturing building with a 7-platform-high production area, material storage area, melter furnace frame, equipment framing, bottling / packaging area, and warehouse building. Construction work included pre-engineered metal building (PEMB), structural steel framework, multi-level stair platforms, heavy-guage wall girts, joist & deck roof systems, and platform flooring using bar grating & plating wrapped with guardrail.

New Elementary School Construction in Warren County, KY
Construction scope for the new 101,500 sq. ft. elementary school included interior/exterior concrete work, a CMU, ICF, and structural steel building, and installation of fire protection wet systems.

National Home Improvement Retailer Construction in Bowling Green, KY
Site utilities for new retail construction project. Scope of services include installing infrastructure for fire line, water, sewer, storm, and gas.

Metals Manufacturing Building Addition in Russellville, KY
New manufacturing building with a production area reaching 73’ high on one end to 62’ on the other. The building also houses an office area, equipment mezzanines, pipe support framing and a 336’ long crane runway system. The building structure is structural steel along with a mix of heavy and Lt. gage wall girts and joist & deck roof system. There are structural stairs & railing throughout the building for mezzanine access along with ladders at floor pits.

Multi-Building Metals Facility Construction & Expansion in Bowling Green, KY
Structural steel multi-building construction & expansion project completed over four self-standing phases to align with client directives.

Educational Institute Construction in Bowling Green, KY
Painting service project work as part of new construction with 180,000 sq. ft. footprint. Scope of service included joint sealants, caulking, prepping, priming, block filling, painting, and sealing. Areas of application included courtyard site concrete, masonry, walls, soffits, ceilings, door fames, and metal surfaces.

Agricultural Warehouse Construction in Springfield, TN
Construction included grading 100,000 sq. ft. building pad, assembling 96,000 sq. ft. pre-engineered metal building (PEMB), running plumbing systems, installing electrical and lighting systems, and interior/exterior fire protection systems including 1000 GPM fire pump supplying 3 dry systems.

Automative Manufacturing Shutdown Renovation in Franklin, KY
Industrial facility shutdown project with urgent turnaround to resume operations, with 34,000 sq. ft. footprint in total. Project included removal of existing floor coatings and installation of epoxy floor coating system in aisles, pedestrian walkways, line striping, and pedestrian traffic indicator marks.

School & Educational Center Installation & Renovations in Edmonson County, KY
Installed electrical system for new 20,000 sq. ft. vocational and technology center addition on high school campus. This project also included upgrading the campus fire alarm system to voice evacuation and renovating the older electrical system, lighting, usage grid.

Speculative Warehouse & Manufacturing Facility Construction in Bowling Green, KY
The 210,000 sq. ft. building features pre-engineered metal building (PEMB) structure, interior/exterior fire protection wet systems, and concrete dock walls/pits, slab on grade, grade beams, pier stems, and footings. Additional exterior concrete work includes 28,000 sq. ft. of paving, retaining walls, sidewalks, extruded curb, and pipe bollard.

High School Campus Addition & Renovations in Hardin County, KY
Structural steel framing for 172,638 sq. ft. new addition of kitchen, cafeteria/commons, media center, administration, auxiliary gym, and additional classrooms. Renovations across entirety of 321,515 sq. ft. campus include new plumbing system, geothermal well fields, hydronic piping, water source heat pumps, and HVAC ductwork.

National Retail Chain Construction in Smiths Grove, KY
Extensive concrete construction summing up to 413,000 sq. ft. of paving including tilt-up paneling, 8,000 sq. ft. of roof slab, footings, grade beams, slab on grade, ADA ramps, step-offs, pole bases, and more.

Electrical Repairs for Automotive Manufacturing Facility in Bowling Green, KY
Lighting system repairs, equipment feed replacements, and main switch gear breaker replacements following extensive storm damage.

Healthcare Facility Renovation in Bowling Green, KY
Renovation of 54,000 sq. ft. healthcare facility including all new plumbing, HVAC systems, LED lighting, usage layouts, and generator installation.

Aerospace Manufacturing Facility Construction in Morgantown, KY
A 150,000 sq. ft. pre-engineered metal building (PEMB) construction for an aerospace manufacturing facility.
Stay Connected
For more updates from our teams and job sites, follow Stewart Richey Contracting Group on LinkedIn or sign up for our quarterly newsletter.