Speculative Warehouse & Manufacturing Facility Construction in Bowling Green, KY

This 210,000-square-foot project brought together Stewart Richey’s Site Utilities, Concrete, Metal Building Systems, Electrical, Mechanical, Fire Protection, and Painting divisions. The building features a pre-engineered metal building structure, interior and exterior wet fire protection systems, concrete dock walls and pits, slab-on-grade floors, grade beams, pier stems, and footings. Additional exterior concrete work included 28,000 square feet of paving, retaining walls, sidewalks, extruded curbs, and pipe bollards.
Metal Building Systems
Fire Protection
Concrete
Electrical
Mechanical
Painting
Site Utilities
Industrial

Date

2026