Automative Manufacturing Shutdown Renovation in Franklin, KY

Industrial facility shutdown project with urgent turnaround to resume operations, with 34,000 sq. ft. footprint in total. Project included removal of existing floor coatings and installation of epoxy floor coating system in aisles, pedestrian walkways, line striping, and pedestrian traffic indicator marks.
Painting
Industrial

Client

Franklin Precision Industry

Date

Dec. 2025

Have a Project Like This?

Our estimating team can help you plan, price, and staff your next project with confidence.